Denver International Airport: Report On A Construction Project That Had Major Cost Overruns.

2354 words - 9 pages

IntroductionThis report looks at the construction of Denver international airport. It looks at the airport came to be through the vision of Mayor Pena. It also looks at the construction of the airport and the subsequent delays and cost escalation that the airport suffered. This should lead us to the conclusion of whether or not this airport can be considered a success.The early stagesWhen the 53 sq miles of land in Adams County had been purchased for $40,000 an acre the ball was in motion for the construction of a new airport. The design was put out to any willing architects, that this new airport was to be somewhat of an iconic building as well as being the largest airport in the United States.Location of the airportThe winning design was from an architect company called Fentress Bradburn. There design was that the airport would look like the Rocky Mountains with its tensile membrane roof made to look like the snowy capped Rocky Mountains.Picture of the completed airportThe architects also priced the building of the project and put the price at $1.339 billion dollars. So Federico Pena set out on his way to getting the airport built. His first victory came when fifty chambers of commerce in the Denver metro area backed the proposal for a new mega-airport. So did suburban Mayors and County officials, construction workers and the AFL-CIO. Colorado's full delegation, including liberals and fiscal conservatives, greased the wheels in Congress. (http://www.hcn.org/servlets/)His next obstacle to hurdle would be the public vote as two referendums were scheduled first, in 1988 and then the second in 1989. To get his yes vote Federico Pena staged many high-powered breakfasts and even showed of a $24000 model of the airport at a public meeting. This sort of spending made it very hard for the vote no campaign, which was being outspent by as much as 4 to 1. This is due to the vote yes campaign being mainly funded by businesses that were ready to profit, such as utilities, banks, lawyers, speculating savings-and-loans, and developers hoping to cash in on real estate in the annexed area. The crucial second referendum was held on May the 16th 1989. The ballot papers were worded in a very pro yes way. The ballot papers opened with (http://www.hcn.org/servlets/)In order to create more jobs, stimulate the local economy, and meet future air transport needs..." and ended, with "... using no city taxes."When the votes were counted it was Federico Pena who was celebrating as the motion had been passed by 63 in his favour.The design and construction process was organized under a project management system. In this system the city joined up with the architects, engineers and an airport design firm to coordinate the construction of the airport. In 1989 the city began to solicit bids for the construction of the airport without consulting the main users of the airport - the airlines. This led to some major design changes for the airport many of them in the mechanical,...

Find Another Essay On Denver international airport: Report on a construction project that had major cost overruns.

Project report on pepsi

6385 words - 26 pages category of fabricating material and parts. Installation Manufactured products that are an organization's major expensive and long lived equipment are termed as installation. Accessory Equipment Tangible products that have substantial value and are used in an organizations operations are called accessory equipment. This category of business goods neither becomes an actual part of finished product nor has a significant impact on the

Procurement Strategy For A Construction Project

1123 words - 4 pages 1.0 Introduction To select a suitable procurement strategy for a construction project, there are some issues which need to consider. From all of those issues, there are 3 big issues that mainly affect the selection decision which are time, cost and quality. There is several type of procurement strategy available in market that commonly used for construction project and each of the common method will be analyze and compare to find the most

Fast Track Project Management for a Construction Project

590 words - 2 pages client in their building quicker, which often results in earlier operational cost savings. The major advantage is time savings.Despite it being a popular construction method with many advantages to both the client and the builder, fast tracking also carries certain inherent disadvantages. Certain frameworks that must be controlled in any type of construction process include:* Cost* Time* Documentation* Quality* DesignBelow we shall seek to determine

A major barrier to international trade activities.

813 words - 3 pages The concept of trust has been examined in a wide variety of organizational and social settings, and accordingly conceptualized in different ways see (Hosmer 1995 for a review). For instance, trust in interpersonal relations is defined as the willingness of one person to increase his/her vulnerability to the actions of another person (e.g., Zand 1972); in economic exchanges as the expectation that parties will make a good faith effort to behave

The treaty of Versailles had a major impact on the Weimar Republic in the years 1919 – 1929

1304 words - 5 pages The treaty of Versailles had a major impact on the Weimar Republic in the years 1919 - 1929, however there were greater social and political factors that impacted the stability of the republic during this time. Following the end of the First World War in November of 1919, the German Political system was abolished and replaced with a republic. A new constitution was established to govern the new Weimar Republic. This constitution was based around

Driver Fatigue: A look at the impact that driver fatigue has had on our roads.

1821 words - 7 pages Description: This essay was for a traffic psychology class. It is basically a good overview of driver fatigue and the impact it has had (especially on Australian roads). It has a lot of statistics which are all relatively current (up to 2000).Driver fatigue is found to be a factor in hundreds of road accidents in Australia every year. This report will set out to examine the phenomenon known as driver fatigue and cover such topics as causes, its

Study on the RBF neural network approach to quick cost estimate of construction projects

5512 words - 22 pages stages of conception to the construction phase. Several techniques have been suggested for conceptual cost estimation. Regression analysis, simulation, and neural networks are among these cost estimation techniques that are used during the early project stages. In regression analysis the project cost is estimated with a regression model including a number of independent variables. Because the type of building has an important effect on the project

Major Effects of Globalization Like Adapting to Changes, Lower Tariffs and Cheaper Labor Cost Make a Difference on Philippine Economy and Firms

2687 words - 11 pages Major Effects of Globalization Like Adapting to Changes, Lower Tariffs and Cheaper Labor Cost Make a Difference on Philippine Economy and FirmsA research paperPresented toJose Cristina Pariña, Ph.D.In partial FulfillmentOf the Requirements forENGLRES2012-2013Nikka Jennine L. EscoberAlejandrea A. LalataApril 1, 2013OutlineIntroductionAdopting to ChangesA. Technological developments1. Communication2. TransportationB. Internet as an agent of

"The Day I First Rode a Go-Kart" - A past experience that has had an impact on your life.

551 words - 2 pages It was a good few weeks into the summer holidays of three years ago, and I was eleven years of age. I was with my family on a vacation in North Wales, situated right near the sunny beaches of a town called "Pwllheli". That summer we had rented out a wooden lodge from a dear friend of my mothers and we couldn't have been staying in a more beautiful place. Around the lodge were towering trees with the hot, glorious sunshine creeping through the

A nursing report based on a research article 'evaluating a palliative care education project in nursing homes'

1178 words - 5 pages This report is based on a research article, ' Evaluating a palliative care education project in nursing homes', by Froggart (2000). The author of the article Katherine Froggart, who is the head of MacMillan Practice Development Unit, Centre for Cancer and Palliative Care Studies, discusses the establishment of a 2-year palliative education pilot project in nursing homes.The aim of her project was to address the palliative care needs of residents

"Innovative Gaming: A New Approach to Consumer Saving" is a project report in which a new product was created that would be worthwhile to the consuming public.

5326 words - 21 pages advantage of watching movies even before they come out. Burned DVDs are often pirated and sold while those films are still being shown in movie theatres.Purchasing the modified chip cuts the cost of buying games: no longer will kids spend a big portion of their allowance on pricey games. The videogame fad is just like any other trend; people get bored of playing old games so they often feel the need to continuously buy the newest and hottest games that

Similar Essays

Bae Automated Systems (A): Denver International Airport Baggage Handling System

1844 words - 7 pages met. In the end, extenuating circumstances conspired to prevent these dates from being met.*BAE lost control of their project to the PMT that had no experience in airport construction, baggage handling system technologies, and the introduction of the new technologies. PMT forced BAE to modify their management structure and project approach to fit the PMT needs. BAE had a track record of success using their own management structures. This

Describe One Event In Your Life That Had A Major Impact On You. (College Preparation) Title: "Bad Skiing Experience"

524 words - 2 pages Sergey LivshitsBad skiing experience It was a dry cold winter day the dirt that was muddy during the warmer months turned rock hard, my two friends George and Eddie and I where sitting outside on the stoop on the stairs in front of my building. We where talking, instead of throwing around snowballs and sledding down the hills. George brought up the idea of skiing, he went skiing every winter with his cousin Eddie they where almost pros

Report On A Group Research Project

1666 words - 7 pages Report on a Group Research Project Introduction In an age of information, people have an increasing number of options to access media for entertainment and information. Yet radio remains to be one of the most accessible and cost-effective conventional media, especially for people with limited financial resources such as university students. However, according to the cursory observation of the researchers of this

Project Report On Amul

8336 words - 33 pages the export subsidy is reduced. Because of this India is expecting major changes in dairy industry of North America, Europe and Australia. It may also get some advantage in this situation. After reduction in subsidies given by other countries India would be able to compete with their products efficiently on price in international markets. At present India has a negligible export to international markets. Both public and private sector have