Failure Analysis Report On The Tacoma Narrows Bridge

718 words - 3 pages

1. Introduction
This memo is a failure analysis report on the Tacoma Narrows bridge. The bridge collapsed on November 7th, 1940 just over four months after it was opened to the public on July 1st, 1940(Green, 2006). The only casualties(good word??) from the bridge collapse were reporter Leonard Coatsworth’s car and dog. The bridge’s design and failure will be discussed, as well as new suspension bridge design methods.

2. Description of Failure
Other similar built bridges such as the Golden Gate Bridge in San Francisco can have vertical oscillations with amplitudes of up to 2 feet and horizontal oscillations up to 6 feet during severe windstorms(Levy, 1992). Due to visible oscillations in other similarly built bridges, oscillations in the Tacoma Narrows bridge were expected. However, the magnitude of the oscillations the bridge experienced and the length of time it took the bridge took to damp them out was of concern to the engineers involved. The length of time Tacoma Narrows Bridge needed to damp out its oscillations was unlike other similarly built suspension bridges, namely the Golden Gate Bridge, whose oscillations were quickly damped due to its larger width-to-span ratio. (need connecting sentence)Just before the total failure of the bridge the oscillations changed from their standard vertical and horizontal to a violent twisting motion, this twisting motion, which reached almost 45°, was what brought the bridge down. After a momentary lull in motion the twisting started up again and the bridge started to break, beginning with smaller suspender cables connecting the bridge deck and the 2 large main support cables. The breaking suspender cables meant that nothing was holding up that part of the bridge deck and it began to fall. (See the figure on page 3.) Once part of the bridge deck began to fall a 600 foot section of the bridge broke free and fell into the water(Levy, 1992). Most of the middle section of the bridge between the two towers broke off.

3. Reasons for the Failure
The specific cause of the Tacoma Narrows bridge failure was the “slippage of the north cable tie at mid-span”(Goller, 1965). The imbalance caused by the broken cable tie initiated the twisting motion, which was the ultimate reason for collapse. The bridge was part of...

Find Another Essay On Failure Analysis Report on the Tacoma Narrows Bridge

Point of View on the Cask Bridge

1034 words - 4 pages      In the minds of many, legendary director Alfred Hitchcock’s infamous shower scene in the 1960 classic Psycho brought the phrase “point of view” into the language of the general public. What most do not realize is that those in the many spectrums of entertainment have been taking full advantage of the benefits brought on by an audience being dealt a limited field of vision for hundreds, if not thousands, of years

E-BUSINESS SYSTEMS IMPLEMENTATION: A REPORT ON SUCCESS/FAILURE

3590 words - 14 pages The impact of electronic commerce on the economy extends far beyond the dollar value of e-commerce activity. Business are using e-commerce to establish and extend competitive advantage by providing more useful information, expanding choice, developing new services, streamlining purchasing processes and lowering costs.Many organizations have been involved in electronic commerce (for example trading electronically through proprietary systems like

Analysis of the Failure of Fire Control

1455 words - 6 pages on analysing the governance failures of one of the most innovative and promising UK Government Information Techology project: FiReControl. Started in 2004, FiReControl was meant to be the future of Fire and Rescue Service. Instead after 7 years it was cancelled and branded as "one of the worst cases of project failures " in UK Government's history. It is argued that the failure of the project have been of two types (1) Uneffective engagement of

The failure from the "war on drugs"

2096 words - 9 pages The drug war continues to be an ongoing issue in the US – and, to some extent, around the world. The contentious policy, since its inception, has been meticulously documented by historians and filmmakers alike. This paper will explore the failure of “War on Drugs” in the US by engaging with textual scholarly secondary sources to which will be supplemented by a relevant documentary, The House We Live In by Jarecki. It is the war on drugs, and

Industry Analysis Report on Kmart

1060 words - 4 pages Industry Analysis Report on Kmart INTRODUCTION Kmart is a huge vintage company that had peeked at one time and now is struggling to survive due to competition and other legal battles. This analysis report will describe and analyze the major forces that shape the structure and competitive intensity of Kmart. This report will look at Kmart’s history, competitors, marketing strategies, and some legal battles that have affected the

Website Analysis Report on Keurig

874 words - 4 pages of the store one and find each separate system listed. Website Analysis Report 2 The next tab is the beverages tab that allow for you to shop for a particular beverage that you can make with the system that you have. The last tab called accessories consists of additional products that accommodate the brewing systems as well as gift certificates. Some examples of accommodating accessories include coffee cups and carousels to hold

Reflecting on our failure: The Rwandan Genocide

1099 words - 5 pages s today marks the 20th anniversary of the Rwanda Genocide, the United States reflects on its failure to react to the tragic conflict. Over the course of 100 days in 1994, hundreds of thousands of Tutsi people suffered and were killed by machetes, grenades, clubs and rape; all brought on by the Hutus. Fueled by the tensions growing between the two ethnic groups over dominance and suffering economy, the Hutu people began to blame the Tutsis for

Analysis of A View from the Bridge by Arthur Miller

2943 words - 12 pages Analysis of A View from the Bridge by Arthur Miller ‘A view from the bridge’ was written in 1995 by Arthur Miller. The play is based around an old man named Eddie and his family, living in a rough neighbourhood or slum on the north facing side of Brooklyn Bridge. The play was set between 1940 and 1960 in Brooklyn, New York. A character in the play called Alfieri narrates the play in the present tense and describes the

The report outlines the factors surrounding project failure. It highlights reasons effecting the risks of project failure and gives examples

959 words - 4 pages Project FailureThe following report will outline some of the reasons why projects fail. Projects failing occur for a number of reasons. Poor planning or management is one of the main causes of projects failing.For a project to be successful it needs to be correctly planned to ensure that everything flows. If a project is poorly planned then it will result in project failure."In a survey of management consultancies...90% of projects went over

Film Analysis: The Minority Report

1954 words - 8 pages of the book and the movie. They were made in two different time frames by two different people, and made with a traditional but radical transition. Like any other, the book is supposed to seem more detailed and convincing, but in this case I vote for the movie by Steven Spielberg. The film on The Minority Report comes to life in a modernized and technical way rather that the book, just old John and deformed idiots called pre-cogs. Furthermore, to

The Successful Hero on a Path to Failure

1876 words - 8 pages The Successful Hero on a Path to Failure What is a hero? Is a hero is a great individual with powers or qualities that separate him from the rest of the society or world for that matter. In a sense, perhaps, I think a hero can be much more than just having these particular qualities. In my opinion, a hero is someone that also commands great respect. There must also have been a great event or deed for someone to be deemed a hero

Similar Essays

Failure Analysis: The 1940 Collapse Of The Tacoma Narrows Bridge

2303 words - 10 pages understand and learn about past failures in engineering and using this newly gain knowledge, they are able to construct a better design which will lower fail rate and improve the factor of safety within device, components of structure. In this failure analysis report the topic of choice that will be addressed is the engineering failure of the 1940 Tacoma Narrows Bridge in the U.S.A state of Washington that collapsed in the November 1940 due to its

Reasons Of The Failure Of Tacoma Narrows Bridge

2621 words - 11 pages environmental conditions and building materials, design of the bridge has played a significant role at the failure. One way to see the failure reasons of Tacoma Narrows Bridge that developed from its design is analyzing the sections. While having the third longest span of existing suspension bridges with 853 meters length, the width of the span was extremely short; 12 meters. This made an unpredicted impact on the bridge with the use of plate girders

The Bridge On The River Kwai

650 words - 3 pages The film I have chosen for my 1950’s film analysis is The Bridge on the River Kwai. Directed by David Lean, The Bridge on the River Kwai follows a battalion of British soldiers who find themselves trapped in a Japanese POW camp during WWII in 1943. The British soldieries are led by Colonel Nicholson (Alec Guinness) who is ordered by the commandant of the POW camp, Colonel Saito (Sessue Hayakawa), to build a railroad bridge over the Burmese river

Book Review: The Bridge On The Drina

705 words - 3 pages prosperity of all our people” (244). This spirit among the Visegrad community, especially the youths, was why many of them desired for action and even personal sacrifice. The only effect the Ottomans and Austrians really had on Visegrad, was the rise in nationalism once their Slavic town was threatened. Modernization in Visegrad started with the building of the bridge. Once the bridge was complete, time in Visegrad seemed to stop, and the local